Answer / jyotirmaya

Normally test are done before installation and commissioning
of the transformer. The following test are done;
1. Visual Inspection
2. Insulation Resistance Test
3. Ratio Test
4. Vector Group Test
5. Magnetizing Current Test
6. Core Balance Test
7. Winding Resistance Test

Is This Answer Correct ?    38 Yes 3 No

What are the testing to be done before the installation of 1000 KVA Transformer?..

Answer / p m tamhane

Polarity Test also an important before loading

Is This Answer Correct ?    5 Yes 0 No

What are the testing to be done before the installation of 1000 KVA Transformer?..

Answer / rajan singh tanwar(j.k. cement

For Power
Transformers the
following Pre
Commisioning tests
are done:-

1.Visual Inspection
2.Measurement of IR
Value
3.Measurement of P
I Value
4.Measurement of
Winding
Resistance
5.Short Circuit Test
6.Oprn Circuit Test
7.Magnetic Core
balance Test
8.Voltage Radio Test
9.Oil BDV & Acidity
Test
10.Checking the
function of
OTI, WTI, OSR, MOG,
PRV
Relays
Last one for the
relay's testing but
it also comes under
transformer testing.

Thanks

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what sq.mm copper pvc wire need for ac load current 25amps for 230v ?

4 Answers   Khadamat, Siemens,


what is difference between power & distrubution transformer ?

3 Answers  


what is the difference between RCCB and ELCB?

3 Answers  


Why capacitor bank ratting Kvar?

1 Answers  


if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)

0 Answers  






What is relation between mu(nought) and epsilon(nought)?

0 Answers  


There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?

0 Answers  


What is LMU and LMDU. in PLCC communication of 132 kv transmission line. is it possible to use only one LMU with out LMDU ?

1 Answers  


Differnce between earthing and nuetral

3 Answers   S Tech, wbsedcl,


in gen traf what is ONAN , ONAF , OFAF and DYN

3 Answers  


What is oil temprature with A/T contacts in Transformer ?

1 Answers  


why we can use 1 to 5V dc

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)