What are the test involved in DG auto synchronizing panel
before in manufacturing place before dispatch.

Answers were Sorted based on User's Feedback



What are the test involved in DG auto synchronizing panel before in manufacturing place before di..

Answer / sachin

Generally a DG manufacturer have facility of load testing
at there end. While testing auto synchronisation ,
protective relaying like Reverse power , Ground Fault ,
Short ckt , voltage unbalnce etc test can be carried out.
For synchrinisation test grid power & DG power can be used.
other regular test can also be carried out at manufacturing
stage also.

Is This Answer Correct ?    6 Yes 1 No

What are the test involved in DG auto synchronizing panel before in manufacturing place before di..

Answer / engineered

DG auto synchronising panel are equiped with Numerical
series relays,
At manufacturing facility grid power is used for
synchronisation purpose.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How can i learn to programme every VFD. Or is there any typical study to understand VFD programming.

1 Answers   Volkswagen,


Define filter?

1 Answers  


I have a 25kVA three phase transformer on our property. Will this transformer be large enough to run a large home with swimming pool, spa, 2 off full size reverse cycle air conditioners to service a 100 square house (10,000 square feet or 930 square metres)and the general power consumption of this house without upgrading to a 63kVA transformer.

1 Answers  


a 120 60 watt incandescent lamp has to be operated from 50 c/sec 1 phase ac supply. in order to do this a circuit element has to be connect in series with the lamp. which one of the following sries element is preferable.

1 Answers   SSC,


During a temperature rise test of a bus duct, it is fed with 415 volts at 2000 amperes. Why dont we get an electric shock if we touch the bus bars?

7 Answers   ABB, SDBL,


what is the difference between OD and VL

1 Answers   Bescom,


WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?

1 Answers  


Explain how to determine capacitor tolerance codes?

1 Answers  


what is the acceptable insulation resistance for motor/transformer?

2 Answers   Reliance, Tata Motors,


what is inductance function?

3 Answers  


In vapour absorption refrigeration machine fluids used are

1 Answers   Caterpillar,


what will happen if the prime mover on the field excitation of the on-coming generator fails?Explain.

1 Answers   Ahsanullah University of Science and Technology,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)