How to find out the quantity of steel FE415

Answers were Sorted based on User's Feedback



How to find out the quantity of steel FE415..

Answer / vijendra singh

sq of dia divided by 162
then unit will in kg/meter

Is This Answer Correct ?    210 Yes 19 No

How to find out the quantity of steel FE415..

Answer / sandy

Sq.of the dia of the bar by 162 x length of the bar then
unit will in kgs
it should be
Dia of the bar is in mm
Length of the bar is in m then only Quantity of steel in kgs

Is This Answer Correct ?    120 Yes 20 No

How to find out the quantity of steel FE415..

Answer / santosh singh

QUANTITY OF STEEL :3.14 / 4 * d2 * 7850
(sq. of d)
EG. IF DIA OF STEEL ROD IS 12mm = 12/1000 = 0.012metre
QUANTITY OF STEEL PER METRE RUNNING STEEL ROD IS
= 3.1416/4 X [0.012]2 X 7850 = 0.89 KG/METER
OR IT CAN BE FOUND BY ....
QTY OF STEEL = d2/162.19 kg per running meter
where d is dia of bar

good luck..........

Is This Answer Correct ?    75 Yes 8 No

How to find out the quantity of steel FE415..

Answer / kiran babu t

According to IS Code the weight for Fe 415 or 250 or 500,

Unit wt of steel*area of reinforcement=Wt of rod(1m)

Is This Answer Correct ?    37 Yes 11 No

How to find out the quantity of steel FE415..

Answer / b. k. iragar

0.00618 x square of the dia of bar in mm x length of the
bar in mtr.= quantity in kg/mtr.

Is This Answer Correct ?    32 Yes 8 No

How to find out the quantity of steel FE415..

Answer / mohammed mohiddin

1. Unit wt of steel Ws = 0.785 kg/cm^2/meter length.


2. Crossectional Area (As) of steel can be found using

formula


As = pi x d^2/4

where d = dia of rebar in cm.


3. Now, wt of steel = Ws x As kg/m



Eg:


Take,

d = 16 mm


Wt of steel per meter lenght = 0.785 x 3.1428 x (1.6)^2/4

= 1.58 kg/ meter length of bar


This can be simplified for calculation as below:



Wt of steel = square of dia in mm/162 (kg/ meter length)


Note:- This is very simple method where we must remember to

mention dia in millimeter to get result in kg per

meter length of rebar.




...Good luck...

Is This Answer Correct ?    22 Yes 1 No

How to find out the quantity of steel FE415..

Answer / t kiran babu

consider it for 1m length,
unit wt. of steelxarea of reinforcement=quantity
unit wt. of steel = 78.5 kg/cm2
area of reinforecement = (22/7/4)dsquare

Is This Answer Correct ?    28 Yes 8 No

How to find out the quantity of steel FE415..

Answer / hisham

STEEL WEIGHT (KG/M)

Ø6 0.22
Ø8 0.395
Ø10 0.616
Ø12 0.888
Ø16 1.579
Ø20 2.466
Ø22 3.049
Ø25 3.854
Ø32 6.313
Ø40 9.864
Ø50 15.41

Is This Answer Correct ?    20 Yes 2 No

How to find out the quantity of steel FE415..

Answer / shine saleem

Dia of bar square/162= wt kg/m.

Is This Answer Correct ?    20 Yes 3 No

How to find out the quantity of steel FE415..

Answer / jayaraaj

dear friends,

pls check my ans.

if 12mm bar - .62*1.2*1.2 - .89 kg/m
if 16mm bar - .62*1.6*1.6 - 1.59 kg/m

if wrong pls inform

Is This Answer Correct ?    21 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed

0 Answers   AG Technologies,


what is IS

12 Answers   GMR, JMC, JMC Projects,


As a proof of my analytical skills I was asked to give an example of a real life situation that i have solved analytically ? Can anybody give me a clue what kind of examples should be a suitable answer ?

0 Answers   Infosys,


How you calculate cement,sand,20mmbluemetal,40mmbluemetal,bricks for various works

1 Answers  


what is the minimum & maximum compressive strength n/mm2 of M-30 mix design cube

1 Answers  






Why camber is provided?

2 Answers   G R InfraProjects, Tata Steel Limited,


How many cement mortor dry quantity required for 1m3 ?(1:4)

3 Answers  


what is th consuption of cement , sand in plastering for 15mm thick cm1:4,1:3

1 Answers  


What are the advantages of cad software’s?

0 Answers  


what is the difference between tsp & tower

0 Answers  


what is difference between design mix and nominal mix,where the design mix is used?

2 Answers  


why demand factor less then 1 ?

0 Answers   Simplex,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)