How to find out the quantity of steel FE415

Answer Posted / jayaraaj

dear friends,

pls check my ans.

if 12mm bar - .62*1.2*1.2 - .89 kg/m
if 16mm bar - .62*1.6*1.6 - 1.59 kg/m

if wrong pls inform

Is This Answer Correct ?    21 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2137


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1514


how to calculate the concrete mix m30 by volume

1090


Explain what are the skills required to become an architect?

699






1:4:8 pcc calculation 591 cu.ft

1798


How many pyramid in egypt?

631


What are new methods /technologies of pothole patching?

1878


Explain what is the difference between built area and super built up area?

685


How do you measure concrete?

766


how much of the strength comes from post-production curing

1866


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2379


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6262


what is m30 in concrete tiles

1892


door and window wood work calculations and different methods

1661