How to find out the quantity of steel FE415
Answer Posted / jayaraaj
dear friends,
pls check my ans.
if 12mm bar - .62*1.2*1.2 - .89 kg/m
if 16mm bar - .62*1.6*1.6 - 1.59 kg/m
if wrong pls inform
| Is This Answer Correct ? | 21 Yes | 5 No |
Post New Answer View All Answers
Define graphics window?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Which tests are performed on soil to decide the type of foundation to be provided.
What is costing in 100squre feet bricks
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
How to check slab shuttering level.? Or check list for slab ?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
how many minimum admixtures are used in water froofing structures
States some of the tool bars used in cad?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
How to fix toll charge for a particular vehicle at toll booths in a highway?
Formula for calculation volume of essentric footing
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh