Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula



i have open space in my house, i want to make pcc there, si want to know how i calculate material , ..

Answer / pradeep setty

your area should be 10'x10'in to thickness of concrete. Normally the thickness for open space is 4' to 5', but you have given the thickness has 25' also we need to select a standard concrete mix like M10,M15, M20...has per IS Code
So according to the dimension your requirement of concrete is 2.08m3 and i presume that M15(1:2:4) is sufficient for this work

Calculation
(1:2;4)= 7 cement by weight is 1440.00 kg/m3
1. cement required is 2.08/7 = 0.2971kg/m3* 1440.00 kg/m3 = 427.82 kg so (50 kg/bag) = 427.82/50 8.55 bags say 8.5 bags
2. Sand required is 0.2971*2 = 0.5942kg
3. Metal required is 0.2971*4 = 1.1884 Kg

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

why crakes are developped in opening corners

3 Answers  


how to calculate round stirrups.

4 Answers   Infinity Engineering,


during site visit if i find voilation going on,what can i do,how i act?

3 Answers  


how to reduce heat of hydration in concrete?

2 Answers  


What are the advantages of Prestressed Concrete

4 Answers  


2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;

1 Answers   TCS,


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

0 Answers  


If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not

2 Answers   Al Fara, Unity Infraprojects,


can you give me the details of rate analysis of steel and concrete?

0 Answers   L&T,


What is ngl level and how it is transfer to column or beam??

1 Answers   Hitech,


what is the grade of lean concrete?

3 Answers  


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)