Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula



i have open space in my house, i want to make pcc there, si want to know how i calculate material , ..

Answer / pradeep setty

your area should be 10'x10'in to thickness of concrete. Normally the thickness for open space is 4' to 5', but you have given the thickness has 25' also we need to select a standard concrete mix like M10,M15, M20...has per IS Code
So according to the dimension your requirement of concrete is 2.08m3 and i presume that M15(1:2:4) is sufficient for this work

Calculation
(1:2;4)= 7 cement by weight is 1440.00 kg/m3
1. cement required is 2.08/7 = 0.2971kg/m3* 1440.00 kg/m3 = 427.82 kg so (50 kg/bag) = 427.82/50 8.55 bags say 8.5 bags
2. Sand required is 0.2971*2 = 0.5942kg
3. Metal required is 0.2971*4 = 1.1884 Kg

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion

1 Answers   ITD, L&T,


What is Lean Concrete?

12 Answers   L&T,


for brickmasonry strengthwise which bond is better?

4 Answers  


how to creat mix m-20? and how to check shuttering & how is mark layout at open ground

1 Answers  


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

0 Answers   Genpact,


WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC

7 Answers   Omaxe, Shoba Devlopers,


tensile strength of shuttering ply wood=?

2 Answers   L&T,


When was the first motorway built in england?

0 Answers  


In 250x250mm cube, how much there will be cement,sand,water,and gravel

4 Answers   TATA,


beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.

3 Answers  


1:6 brick masonry cement and sand calculations

2 Answers   NCC,


How will find compresive strenth of M20,M25,M30 after 7day,8day 28day etc please drive step by step not shot?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)