How much is the curing time period?
Answer / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate reinforcment in staircase cranked beam?
Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
What is meant by scaffolding coefficient?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How will you reduce the concrete flow after mixing the concrete
which grade of cement mostly used in construction and why..??
is it correct method to use crush sand in concrete as per is code
what is anchorage? Why anchoring of reinforcing bars necessary and what are the shapes ?
Define What are the uses of Groynes?
who much should be the lap length in reinfocement
What is pre-stressed concrete?
what is water cement ratio in design mix and its percentage in concrete and mortar?
1 Answers Jain Housing, Shivshakti Sugars, Tulip,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)