How much is the curing time period?
Answer / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
Is This Answer Correct ? | 0 Yes | 0 No |
Dear Sir , I have my diploma in civil engineering in distance mode, so can i do my B.teck in regular stream . kindly suggest Regards Ramakrishna
what is the measure of slump
what is studds? where it can be done?
If 600mm*200mm*150** size bricks comes 55 piece in one cubic meter then how many 230mm*115mm*75 bricks in one cubic meter
neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement
What is a BBS?Find out the cutting length for a foundation size 600 x 600, cover 50 mm?
what is differences between ferrock and concrete ?
WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
Structural steel: For a thumb rule check in field, the allowable weight which can be hung down for 10mm dia mild steel rod, of yield value of 0, 25 KN/mm2 and applying a factor of safety 2.00, will be how many kg?
what is the cutting length of 90 degree bend in four corner ring in column of 8mm dia size of column 450mmx250mm of clear cover 20mm?
13 Answers Abhiram Infra Projects, Al-Darwish, Sobha Developers,
how do you stabilize a waterlogged area in road construction