Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answers were Sorted based on User's Feedback



Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / v.kapil

Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.

Is This Answer Correct ?    15 Yes 0 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / binu

concrete acheives its 60% strength in
7days and hence its considered safe to
deshuttter.

Is This Answer Correct ?    13 Yes 1 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / mhbkpr

We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.

Is This Answer Correct ?    3 Yes 1 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / m.haseeb yaquobi

becuase it reache more then 50% of its full strenght

Is This Answer Correct ?    3 Yes 3 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / saif raza

As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.

Is This Answer Correct ?    2 Yes 2 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / ankit

concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.

Is This Answer Correct ?    6 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

Define Finite element method (FEM)

6 Answers  


wht is off shore structure

1 Answers  


which is the cheapest type of temporary flooring(say for using 6 months on)?

1 Answers  


what is the types of surveying?which type of survey carrying for type of work?

1 Answers  


significance of specific surface area of particles?

2 Answers  


what is the tensile strength of 10swg and 8swg gabion wire?

0 Answers  


volume of one cement bag

4 Answers   Grand Peaks, Omace, Swasudha Infra,


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

0 Answers   Ravi Group,


How many Steel used in 1 cum tower foundation

0 Answers   STCS,


How do you find the difference between 53&43 grade cement in site?

6 Answers   L&T,


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

0 Answers  


Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)