Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answers were Sorted based on User's Feedback
Answer / v.kapil
Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / saif raza
As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
Is This Answer Correct ? | 6 Yes | 8 No |
how many nails in 1 kg for 1 inches?
2 Answers Jagson, Shoba Devlopers, Sobha Developers,
mix design of concrete using indian standard methods
VAT and CST ? Which benefits for buyer ? Why benefits?
What is the difference between "working stress method" And "limit state method"?
pls give me ans to ACT formula cube testing porpuse
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
50m3 concrete volume how much cement sand aggregate details radio m20grade
5 Answers L&T, Mars Planning Engineering Services, Relcon Infraprojects,
what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?
What is the difference between first angle projection and third angle projection?
9 Answers CLG, Elecon, JTEKT, Nagarjuna Construction,
what is the types of surveying?which type of survey carrying for type of work?
how to test the quality of bars???
How to find the no. of main bar in circular footing (Central shaft of CLF)
3 Answers N J Devani Builders, Simplex,