Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answers were Sorted based on User's Feedback



Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / v.kapil

Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.

Is This Answer Correct ?    15 Yes 0 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / binu

concrete acheives its 60% strength in
7days and hence its considered safe to
deshuttter.

Is This Answer Correct ?    13 Yes 1 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / mhbkpr

We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.

Is This Answer Correct ?    3 Yes 1 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / m.haseeb yaquobi

becuase it reache more then 50% of its full strenght

Is This Answer Correct ?    3 Yes 3 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / saif raza

As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.

Is This Answer Correct ?    2 Yes 2 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / ankit

concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.

Is This Answer Correct ?    6 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

0 Answers   Indlands,


What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a stndard size of 440x215x100?

2 Answers  


In case if concrete box girder bridges how is the number of cells determined?

0 Answers  


what is levelling staff least count

13 Answers   L&T,


what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe

1 Answers  


From which end do you start deshuttering in a) cantilever portion b) simply supported portion

3 Answers   ITC Infotech,


How will you reduce the concrete flow after mixing the concrete

0 Answers   Hi Vision,


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

0 Answers  


In earth work 1300 cum soil how to calculate how many liters require in water

0 Answers   L&T,


Why joints are provided?

0 Answers  


How is the strength of cement measured?

0 Answers  


How to estimate quantity of paint in 1M3

1 Answers   Simplex,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)