Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answers were Sorted based on User's Feedback



Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / v.kapil

Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.

Is This Answer Correct ?    15 Yes 0 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / binu

concrete acheives its 60% strength in
7days and hence its considered safe to
deshuttter.

Is This Answer Correct ?    13 Yes 1 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / mhbkpr

We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.

Is This Answer Correct ?    3 Yes 1 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / m.haseeb yaquobi

becuase it reache more then 50% of its full strenght

Is This Answer Correct ?    3 Yes 3 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / saif raza

As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.

Is This Answer Correct ?    2 Yes 2 No

Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?..

Answer / ankit

concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.

Is This Answer Correct ?    6 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

how calucate cement sand ratio for plstering

0 Answers   DMRC,


what is the use of water bar in water tank and is this an extra item in estimate?

0 Answers   PS Constructions,


What is the difference between 53 grade and 43 grade cement

0 Answers   RPP Infra Projects,


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

0 Answers   GMR,


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

0 Answers  


what is the nomimanal size' os agg.'for reinforced concrete 2 th ph value of water to be used in conc. Shall generly be

5 Answers   RRB, Sail,


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

0 Answers  


HOw to find the depth of foundation?

14 Answers  


NP3 CLASS HUME RCC PIPE

1 Answers  


how to conversation of all construction material in to brass

1 Answers   L&T, Lafarge,


what is the diffrence between Specific gravity & Density??

3 Answers  


1) why bent up are provided at l/4 or l/5 distance not at l/8or l/10? 2) why extras are provided in beams at top and why upto 0.3l distance max.? 3) why chairs are provided in two way slab?

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)