Hi All,
In Repititive manufacturing during backflush we enter the
production date and the batch. The classification for
production date and Shelf life expiration date has been
maintained in the material master.
We have a characteristic "date of last goods reciept"which
updates the characteristic value in the batch
classification automatically from the production date
entered in MFBF Tcode. Even though we have maintained the
min shelf life and total shelf life the system does not
calculate the remaining shelf life for the batch and does
not update the value for shelf life in batch classification.
Please suggest the procedure for updating values in batch
classification for shelf life automatically from MFBF
Regards,
LN
No Answer is Posted For this Question
Be the First to Post Answer
what are the basics of PP ?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is planning horizon?
What is opening period?
What is special procurement & tell one special procurement briefly
Define lsmw.
Tell bom header level & component level
Splitting of production order & product version
what is consignment?
What is process keys
Which tool you are using
Explain PI sheet.