why you considers yourself suitable for the post of site
engineer
Answer Posted / sumeet
as i think that i am capable of doing this kind of work as i
did many work visit and liked to do work in the field. also
im good at management so i wold love to handle the situation.
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
What are the advantages and disadvantages of lead products in construction?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is the formula for Mass of cement grout (Dg)=???
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
How is the leaning tower of pisa supported?
Did any of the egyptian pyramids ever fall down?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What is the development length given in pile?
how statics is different from dynamics
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
what is polity