How can I calculate the Compressive strength of cubes after 28
days of curing?Is there any formula or ration ?
Answers were Sorted based on User's Feedback
AS PER IS CODE FORMULA WAS Fck + 1.65 S
Fck - concrete grade
for M 20 ,M 25 grade s value 4
above M 25 s value was 5
| Is This Answer Correct ? | 24 Yes | 5 No |
Answer / mohsin khan
force = load/area
force is the pressure which comes after testing the cube in compressive strength machine and load is the the reading which we note and area is constant i.e 22.5 cm2
| Is This Answer Correct ? | 16 Yes | 2 No |
AS PER IS CODE FORMULA WAS Fck + 1.65 S
Fck - concrete grade
for M 20 ,M 25 grade s value 4
above M 25 s value was 5
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / m.koti, cosmicon group, vizag
force = load/area
force is the pressure which comes after testing the cube in
compressive strength machine and load is the the reading
which we note and area is constant i.e 22.5 mm2
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / swetha
COMPRESSIVE STRENGTH OF CONCRETE IS CALCULATED BY= LOAD AT FAILURE OF THE SPECIMEN/AREA OF SPECIMEN(ie 15cm*15cm=225cm)
| Is This Answer Correct ? | 1 Yes | 0 No |
after 28days curing compressive strength 100% achieved that means after 28 days 100% pressure can taken .so pressure=load/area.
load means reading of testing machine.
area =(150*150*150)=22.5 mm2 constant.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / done
Seriously I can't believe it. The formulas u r giving is for therotical value of compressive strength . u can calculate that value without making any cube. But for 28 day compressive strength there is machine which applies increasing load untill cube gets failed that load per unit area is nothing but compressive strength. Nowadays we don't have to wait for 28 days as these test are done after 2-3 days on labs n they put these result n their software which will ultimately give the final compressive strength
For more info what's app on 7249474640
| Is This Answer Correct ? | 0 Yes | 0 No |
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
what is ment by surveying?
what"s the formula to find the quantity (consumption) of cement,sand,aggregate for 1m3(1:2:4)?
11 Answers ABB, Construction, Isher, L&T, Saudi Oger, Spectra, Strati,
How to do BBS for Chair Rod?
what opc & ppc cement $ composition?
how to take out quantity of steel used in column and beam?? what is standard formula for it???
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
What is cold joint, what will happen due to cold joint?
what is difference between bending and twisting
how to calculate the cement, sand, coarse aggregate required for one cubic meter of concrete?
What is IS Code ? And What is IS - 9301 ?
How can we make a hole in a solid rectangle using solidsworks?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)