FOR concrete structure curing is important for hydration
process,curing component is good for the concrete if W/C
ratio is more than .38
Answer / m s chouhan
Genrally Exothermic Reaction take place during the
Hydration process.
For the completion of Chmical reaction for gaining the
strength W/C ration generally lies between 0.45 to 0.50
Is This Answer Correct ? | 8 Yes | 0 No |
What is the proportioning by weight of 1:2:3 concrete mix design of cement, sand, gravel, and water in metric for a 3000 PSI concrete strength and a target slump of 75-100mm?
what are the Task work of different labour.?
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
when we select buildup beam
What is Density of cement, sand & aggregate ?
How much pressure will be drop when we apply the P.R.V. In the upvc downtake for stilt 28?
what is the minimum compressive strength in 7 days for m20,m25,m30
what is the Asfalt test?in road constraction..?
Explain what is progress payment?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?