what is IS
Answers were Sorted based on User's Feedback
clean earthing and dirty earthing
1 Answers CSCEC-China State Construction Engineering Corporation,
what is quick sand
what is difference between footing and foundation?
how do we find the nos of bricks in 1 m3 brick masonary
what do you mean by ssd how it calculated
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
For 25mm thick plastering how much sand and cement is used for 1 sft
1 Answers Assurance, Design Consortium,
WHAT IS THE UDL OF TOWER CRANE?
WHAT DLC DESIGN IN CONSTRUCTION
How we calculate the service time of buildings
what is the formula to calculate isolated footing
In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
12 Answers CMR, Modi Builders, Taehwa Enterprises, vvip,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)