why you considers yourself suitable for the post of site
engineer
Answer Posted / shahzad
actually so far as i think that i'm capable of doing such kind of work b,coz previously i'hv workd some where and entirely awared with the terminology of site work.thats why i like to work on site and feel suitable for this position
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
How foundation is designed, Column design and beam design
In which code the the maximum height of concrete casting has been explained
how to calibrate the RM 800
How much cement will require for 1Rmt Skirting laying
what is the minimum cement content for M20 & M25 as per is code -456(2000).
What is the difference between 53 grade and 43 grade cement
how much required strength of cement concrete bricks(size 230x115x75mm)
what is m30 in concrete tiles
what post do you prefer to work in this company and why do you think you can serve better in such position?
five requirements of infill panels for walls?
what is the weight of 10mm,20mm,40mm aggregate