why you considers yourself suitable for the post of site
engineer

Answer Posted / mamatha

Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.

Is This Answer Correct ?    19 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the effect of duration of earth quake on framed structures ?

1800


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

1974


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2080


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2729


why do we provide haunches in rcc box or underpasses?

2467






how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1534


How do you measure concrete?

762


How to find CN by using arcgis 9.3?

1872


what do you know that m20,m25

1388


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3247


Minimum concrete cover in slabs, columns, beams, foundation and other st?

662


what r you reqired for concrete baching plant?

1889


What are the advantages of building a dam on the river nile?

630


what is the Asfalt test?in road constraction..?

1638


what else we can add rather than admixture in concrete to reduce the cement quantity?

5305