why you considers yourself suitable for the post of site
engineer
Answer Posted / mamatha
Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.
Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
what is the effect of duration of earth quake on framed structures ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
why do we provide haunches in rcc box or underpasses?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How do you measure concrete?
How to find CN by using arcgis 9.3?
what do you know that m20,m25
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what r you reqired for concrete baching plant?
What are the advantages of building a dam on the river nile?
what is the Asfalt test?in road constraction..?
what else we can add rather than admixture in concrete to reduce the cement quantity?