why you considers yourself suitable for the post of site
engineer
Answer Posted / mamatha
Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.
| Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
how to calculate steel for slab or footings?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
I need old MMUP exam question and answer for Civil engineering
What are the advantages of cad software?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
how to calculate total cost for slab 35'×8'
How do you measure water flowing through 300mm diameter pipes?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
What Reinforcements Are Used In The Process Of Prestressing?
Which IS Code/American Code applied for coupler test of steel
Doul Bar reinforcement and details of drawing.
Define What is an ice dam sock?
how to calculate the length diamond shaped striupps in column