Explain what happens to planned after it has been converted into production order?
No Answer is Posted For this Question
Be the First to Post Answer
what is difference between group BOM and BOM group ?
Explain Planning file entry.
What is sap pp?
What is detail scheduling
What is number range and where will be configure
Special Procurement type 40 – proc. form alt. plant
Tell me deferent MRP types
what are the costing parameter ?
What are the parameters are there in Order type or in dependent para. config?
How can you create production order without routing and BoM?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?