What is 'capacity planning'?
No Answer is Posted For this Question
Be the First to Post Answer
Integration between PP and SD module.
What is the uses of production scheduling profile and what the configure have you done current project
0 Answers Cognizant, Patanjali Ayurved,
1. how Product Cost Collector Works? 2. What are the master data for MRP? 3. In a production order without making goods issue, i should not be able to do goods receipt. How do we do it? 4. i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done. 5. for in-house production, planned order are generated & for external procurement purchase requisition. i want, system will go in external procurement to a particular vendor. what is the setting? 6. what are the problems you faced in MRP?
Difference between different strategy groups.
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
What is Material status and which view of the material master it is available?
When will the order fully settlement?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
How do you get the system to update this value from the routing?
What is opening period?
What is work center? what are the standard things have to maintain....
What is alternative bom