What is the best process to issue stock to an order?
No Answer is Posted For this Question
Be the First to Post Answer
Which are the exact sap table and field for sap pm notification status?
What level of functional locations should be changed for alternative labelling?
what do you mean by measuring point?
What do the ie05 tcodes in sap- pm mean?
I have a single cycle maintenance plan that is triggered by a counter assigned to a equipment A. If I replace equipment A with equipment B how do I change my Maintenance plan counter? When I use IP02 "change maintenance Plan" the counter box is greyed out. Thanks for any advice.
Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?
On the notification initial screen we select the notification type using iw21 t code. Is there any t code using which we can skip the initial screen and directly open the notification main screen?
What is the process for maintaining catalog a profile for each equipment?
What is the criteria to change the equipment category?
Which of the following Master data is relevant for PM ? ( Bill of Material ,Customer Master , Functional Location ,Vendor Master ??)
If I want to change the planning plant for the task list, how should I proceed?
Can we change equipment category once defined?