Why work scheduling view is required for semi-finished and finished products?
No Answer is Posted For this Question
Be the First to Post Answer
I want to make a career in SAP-PP/QM from the existing manufacturing experence.
Explain In-process inspection.
After doing realization how we will check whether it is working or not?
What are basic dates?
What are the lot size you have used?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is the difference between by-product and co-product and how do you differentiate them in a BOM?
What is the purpose of Catalog? how you reverse UD?
Explain how to create prt master records?
Tell me different mrp types
what is backflush? what are the benefits of back flush?
What are the details in Production scheduling profile?