A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is
No Answer is Posted For this Question
Be the First to Post Answer
what is the use of power transformer in GSS.
0 Answers College School Exams Tests, DLF, TCS,
what is the main purpose of line PT and bus PT?
for a 33/11kv transformer, after step down what happens to the balance 22kv.
25 kva load,
how does grading rings & spacers in transmission line works? Working Principle?
im electrical engineer, could any one help me for FEWA exam questions please ?
What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.
How can we find out earth leakage,(shock)in side the house?.. (with out ELCB)
What is the function of probe in cro?
what is the purpose of taking HV test in LT panel.
what is wore of PLC ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)