which types of tests are required after commissioning of
6.6 kva tranformer?
Answers were Sorted based on User's Feedback
Answer / m k
after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / suresh
to check the oil temp indicator, winding temp indicator,
check the oil level in conservator
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / kashifhabib
I think all the test are performed before commissioning.
| Is This Answer Correct ? | 1 Yes | 7 No |
what is the difference between RCCB and ELCB?
Meggering minimum acceptable Ohms for insulation resistance.
I WANT BHEL PREVIOUS QUESTION
What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?
area control error
which is better ac or dc?
What is meant by SPS Aluminium pipe in substations? Anyone knows whats this?
Draw the equivalent circuit of crystal oscillator?
Which state of India had first started power reforms?
why restricted earth fault protection can not operate for phase faults??as there will be a current in secondary of ct,when a phase fault occurs!
What are the protective devices in a DC/AC motor starter?
What is the importance of creepage distance in disc insulator ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)