What are the control parameters for automatic availability check during sales order? In sales order every time i have to click on check availability tab manually but i want it to trigger it automatically, how to do this?
Answers were Sorted based on User's Feedback
Answer / rajesh kumar
when ever enter material in sales order system automatically checks weather the required material is available in corresponding plant or not, the availability check during sales order process some pre requisites are:
1.maintain availability check/checking group(mm01-sales general plant),if it is daily requirement we maintain 01
if it is individual requirement then we maintain 02.
2.in schedule line category needs to be check - availability and check- requirement
3.requirement class(ovzg) should be check-availability check field - and -requirement field.
4.requirement type should be determined based on item category + mrp type= requirement type(041)in to sales document.
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / saplight
In the sequence as below
OVZG, OVZH, OVZI, OVZ8, OVZ2, OVZ9.
Additional Controls.
OVZ1, OVZK, OVZ7, OMIH.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nag
If you want to perform availability check automatically then you've to check Requirements/Assembly and Availability
in Sheduline category and Requirement class
Is This Answer Correct ? | 0 Yes | 0 No |
What is Item Category Control?
How is Pricing Procedure Determined?
what is difference between individual and collective requirement
Why and when do we use item category 0002?
Without assigning credit control area how can we check the credit
How is sap transportation management licensed by sap? : transportation management
Explain shortly what the SAP business navigator is and how it can be used in an implementation ?
what is EDI ,ALE , Debugging, Smart Forms ,IDOC'S & BDOC'S
what is IN00(tax jurisdiction code)? what is its use? is it used in present indian tax scenario?
Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.
If it is development(service request),what is the purpose?
I am learning sap-sd , is it the basic sap-sd configuration technique only that I should learn ? Will it be enough to appear at the interview ?