on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure?
Answers were Sorted based on User's Feedback
It may be cause due to meter internally circuit open the secondary of ct in meter.due to circuit problem.
| Is This Answer Correct ? | 0 Yes | 0 No |
Lightning stroke or metering core open circuited due to operation of faulty rotary phase selector
| Is This Answer Correct ? | 0 Yes | 1 No |
What is the armature mmf in a D.C machine?
How to calculate cable size between battery charger to Battery ?
What is the permissable nutral current of three phase system as per IS standards?
Which element has power dissipated in it when the source is removed ?
Why transformer called by KVA?
Which one is more accurate servo or stepper motor and why?
WHY SEPARATELY EXCITED MACHINE NEEDS EXCITATION BY DC SUPPLY WHY NOT BY AC
importance of air gap in transformer
what is diffrential relay used in generator plz give brief explanation
why do we use 25kv supply for traction purpose?
What is load boxes ?
What do you mean by a phase angel of instrument transformer?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)