on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure?
Answers were Sorted based on User's Feedback
It may be cause due to meter internally circuit open the secondary of ct in meter.due to circuit problem.
| Is This Answer Correct ? | 0 Yes | 0 No |
Lightning stroke or metering core open circuited due to operation of faulty rotary phase selector
| Is This Answer Correct ? | 0 Yes | 1 No |
TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.
Can I do body earthing of machine by using Cable armour or I have to run another GI wire for body earthing and how many wires I need to run. Is there any rule for this. eartnig
is there any concept of armature reaction in Induction motor?
PLC Training in chennai | PLC Training institute in chennai, PLC Training center in chennai | Best PLC Training in chennai | PLC Training course in chennai | SCADA Training in chennai | PLC Training in india
Safety devices in SF6 Circuit Breaker?
Which standard we are following earthing resistance test
In a transformer ,when voltage decreases current increases. but this is a violation of oms law.why?
WHICH TYPE OF TRANSFORMER USED IN SWITCHYARD IN POWER PLANT?
15 Answers GE, Lanco, NTPC,
whether fibre optic cable in high voltage earth conductor is used for protection circuits
what is broken conductor indication
1.what is use of isolation transformer. 2.Differance between KWH,KVAH,KVARH,KVA. 3.Main use of the CT and PT.
In case of a synchronous generator carbon brushes, some brushes expire before the others. Why is so? When all the brushes are installed at the same time, why don't thee expire at the same time?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)