One work center can assign 2 cost center and one cost can assign to different work center.
Answer / sathish.v131990@gmail.com
one Wc can assign to One Cost centre .
One CC Can Assign to N no of WC
Is This Answer Correct ? | 10 Yes | 1 No |
when we need to close the production order, before the manufacturing or after the manufacturing
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
I have created an order type “ZYC6”, how I know that which types of order it is like process, production or SD order?
What are the levels of batch, explain batch determination process?
What MRP does with Capacity overload
What does the use of ms70 followed by mcec get you?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What are different MRP types?
Difference between MD01, MD02 and MD03.
What is meant by slab?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Difference between different strategy groups.