One work center can assign 2 cost center and one cost can assign to different work center.
Answer Posted / sathish.v131990@gmail.com
one Wc can assign to One Cost centre .
One CC Can Assign to N no of WC
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is finite scheduling?
Explain what happens to plan after it has been converted into production order?
What is the difference between indian and us payroll?
Integration between PP and PM module.
Explain how can you create production order without routing and bom?
What is Production scheduling Profile and use of it?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Have you used Pull list or back flushing in REM?
What is mrp controller means?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Explain why there is need of production version?
Explain what is the need of mrp list if the stock requirement list is already given?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
In the monthly lot size proc, how to generate lot at the end of Period?
What is purpose of schedule margin key?