One work center can assign 2 cost center and one cost can assign to different work center.
Answer Posted / sathish.v131990@gmail.com
one Wc can assign to One Cost centre .
One CC Can Assign to N no of WC
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
Explain what is the meaning of exploding a bom?
What is costing? How it is affected the pp?
Define ‘bom group’?
What are the parameters are there in Order type or in dependent para. config?
You want to insert an inspection check point at the end of an operation. How would you do that?
define variable cost
What do you do to run MRP for just one MRP Controller?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
How did you configure the payscale structure?
What is the planning horizon?
Explain what happens to plan after it has been converted into production order?
Do you have any idea about Capacity Planning?
Where have we to specify the teardown time in one operation?
Mention what are the production process in sap?
What do we do in the realization phase?