Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following connection is best suited for 3-ph, 4
wire system
A delta-delta B star-star
C delta-star D star-delta

Answers were Sorted based on User's Feedback



Which of the following connection is best suited for 3-ph, 4 wire system A delta-delta B star-sta..

Answer / sunil

(C)In a distribution system, delta-star is best suited

Is This Answer Correct ?    20 Yes 3 No

Which of the following connection is best suited for 3-ph, 4 wire system A delta-delta B star-sta..

Answer / sourabh

Ans: delta star
In 11kv/440v STEP DOWN TRANSFORMER primary side 3 WIRE{LINE WIRE'S (R,Y,B)} ARE THERE DELTS WINDING USED BUT IN SECONDARY SIDE 4 WIRE{3 LINE WIRE'S (R,Y,B) AND 1 NUTREAL} 120*3=360 angle.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what will be the minimum megger value for 132 Kv (earthed) potential transformer

3 Answers  


what sis the testing procedure of transformer and ht panel?

1 Answers  


why the transformer secondary voltage is more than the load end voltage like t/f 11KV/433V for 415V(terminal voltage)

4 Answers  


What is meant by H.R.C fuse?

40 Answers   Gas Projects, GSCE, Taj Group,


how dose servo motor works

0 Answers  


I want to ask a question which i faced during testing of Capacitive Voltage Transformer in AIS. We have measured the C1 , C2 individually , but when we start to measure the total C1+C2 , the testing equipment shuts down and says low loading. Kindly is it possible to find the total capacitance by using measuring device. kindly briefly explain the procedure.

0 Answers   AIS,


11kv has three live wires how much voltage is in its single wire(leaving the other two wires)

13 Answers   Power Grid,


IF 8255 CONTROL WORD IS 94H,Tell the chip port work mode ?

0 Answers  


what are the main parts of DG? explian thier functions?

8 Answers   Apollo Power, Tata DoCoMo, Tyco, Vizag Steel,


how winding temperature detects in power transformer...?

5 Answers   Roverco,


What are the causes of electrical faults?

1 Answers  


What is the relationship between the sending end and receiving end?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)