Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate power

Answers were Sorted based on User's Feedback



how to calculate power..

Answer / manoj

p=vi
where
p=power
v=voltage
i=current

Is This Answer Correct ?    9 Yes 1 No

how to calculate power..

Answer / anket

For DC system  it is V*I

For AC system

P = V*I*COS0 (True power)

Q = V*I*SIN0 (Reactive power)

S = V*I (Apparant power)

Is This Answer Correct ?    4 Yes 0 No

how to calculate power..

Answer / ganesh bidgar

p=v*i

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?

0 Answers  


why rating of motor in HP

2 Answers   MSL,


Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.

0 Answers   SK Engineering,


installation of subsatation of33kv

0 Answers  


How can we measure MVAR of a 3 phase transformer.....???

1 Answers   JLL, UPPCL,


Sir I hv to fix 20 ton ac how much electrical power need apply?

1 Answers   Sealand Restaurant,


sir i am fresher.can you please tell me how can i get certificate of competency as electrical supervisor.

1 Answers   ONGC,


What is Dry type transformer.How it works

6 Answers   Vatika,


IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace.

1 Answers   Jindal,


What do you mean by reach and reach the point of the relay?

0 Answers  


6.6Kv feeder feeding tow step down transformers-415V-,what the possible consideration for parrellel operation?

1 Answers  


what is the relation b/w KW and KWH? plz explain with example.

6 Answers   FAG,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)