How to replace dia of bar in beam like 25mm 3no.S at bottom
But due to some reason on site 25mm bar is not available
Then is it ok to provide 20mm 4no.S? Give description or
Formula to calculate area of steel and replacement?
Answers were Sorted based on User's Feedback
Answer / iqbal
Due to some reasons required diameter of steel is not available then we required to compensate the availability of steel at site. i,e if 25 mm 3nos to 20mm the formula is
total area of 25mm steel X nos of rods Divided by area of 20mm dia of one rod
Is This Answer Correct ? | 37 Yes | 0 No |
Answer / krishna
Dia of bar pi/4*d2* no of bars.
If u replace the bars So pi/4*d2
:dia of bar/ replace of bar gives the total bars of available
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / manoj kumar
The formula or the thumb rule for finding of no of bars with spacing .
Let the d= dia of the bar which is to be provided at the place of given bar.
D= dia of given bar in the drawings.
Spacing = d2/D2x(given spacing of bar in dwg.)
for Eg.
d=20, D=25 spacing=200
s=(400/625)x200=128
Is This Answer Correct ? | 12 Yes | 10 No |
1sqm=? wood
2 Answers Ackruti, Nagarjuna Construction, SRS Group,
colum 500*500 8mm cutting lenght
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?
how we control the temperature during concreting ?
What is the factor of safety in civil engineering
How to calculate the design of column by simple method?
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
What"s mean by water macadam road (WBM)?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
How to calculate the Water cement ratio of reqiured compressive Strength of concrete?
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,