How to replace dia of bar in beam like 25mm 3no.S at bottom
But due to some reason on site 25mm bar is not available
Then is it ok to provide 20mm 4no.S? Give description or
Formula to calculate area of steel and replacement?
Answer Posted / iqbal
Due to some reasons required diameter of steel is not available then we required to compensate the availability of steel at site. i,e if 25 mm 3nos to 20mm the formula is
total area of 25mm steel X nos of rods Divided by area of 20mm dia of one rod
| Is This Answer Correct ? | 37 Yes | 0 No |
Post New Answer View All Answers
water leak detection system question & answer
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Why do you want to work here
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
What is Density of cement, sand & aggregate ?
can i get civil engineering test papers.......?????
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
what is the difference between replacement of cement by groundnut shell ash
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
what is the 0 value in quantity surveying
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?