Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to replace dia of bar in beam like 25mm 3no.S at bottom
But due to some reason on site 25mm bar is not available
Then is it ok to provide 20mm 4no.S? Give description or
Formula to calculate area of steel and replacement?

Answer Posted / iqbal

Due to some reasons required diameter of steel is not available then we required to compensate the availability of steel at site. i,e if 25 mm 3nos to 20mm the formula is
total area of 25mm steel X nos of rods Divided by area of 20mm dia of one rod

Is This Answer Correct ?    37 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2179


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

2835


what is the types of door's wood?

2065


Define What is a kip?

1161


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

2254


Why was the empire state building made of steel?

1102


What is Gsb tollens ?

1982


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6732


how many BSCs can i connect to the HUAWEI MSC

2293


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

2299


Which is stronger solid steel rod or hollow steel pipe?

1400


What is semirigid connections?

2131


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2435


How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

2152


What is the sugested procedure of water purification for public supply?

2270