What is the difference in design between Working Stress method
& Limit State Method ? Briefly Explain.
Answer / pintu dutta
Differences between Working stress method and Limit state method
Design of RCC Structures
The design of the components of the RCC structure can be done in the following two ways:
1.Working Stress Method
2.Limit State Method
Working Stress Method
*.The Stresses in an element is obtained from the working loads and compared with permissible stresses.
*.The method follows linear stress-strain behaviour of both the materials.
*.Modular ratio can be used to determine allowable stresses.
*.Material capabilities are under estimated tolarge extent. Factor of safety are used in working stress method.
*.The member is considered as working stress.
*.Ultimate load carrying capacity cannot be predicted accurately.
*.The main drawback of this method is that it results in an uneconomical section.
Limit State Method
*.The stresses are obtained from design loads and compared with design strength.
*.In this method, it follows linear strain relationship but not linear stress relationship (one of the major difference between the two methods of design).
*.The ultimate stresses of materials itself are used as allowable stresses.
*.The material capabilities are not under estimated as much as they are in working stress method. Partial safety factors are used in limit state method.
Is This Answer Correct ? | 7 Yes | 0 No |
1)What is swear, swage and storm water? 2)What are the sizes of bricks based on Nominal, practical and standard? 3) What is the distinguies between the grade of cement 43, 53?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm
whou haat goals do you have in your career
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How can we calculate the cement Quantity in M25?
2 Answers JK Associates, Vardhman, Wave Infratech,
what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper
how much % of cement can be replaced by flyash ....
Give list of building construction equipment & explain about them in brief. How much is fuel consumption of JCB, DUMPER, POCLAIN, TRANSIT MIXER?
What is meant by engineering drawing?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?