How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?
Answer / kabir
for raft foundation depth of exacavation is nearly about
3.0m . because due to having the raft foundaton their will be provision of basement in that structre ..........
| Is This Answer Correct ? | 3 Yes | 0 No |
what is tie-beam?where it used?
12 Answers HCC, Titan America,
If the proportions of concrete is a:b:c i.e if "a" parts of cement,"b" parts of fine aggregate & "c" parts of coarse aggregate are mixed by volume. Then the resulting volume will have a volume of ------? How?
why primer application is required before applying putty
Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the meaning of M50,20? What is 50,what is 20
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is BPM in concrete demolition hammers. what is better a higher value or lower
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
which tests for concrete pouring period at the site?
what is the difference b/w full length and cutting length?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)