Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


draw a loop drawing of vibration beginning to end



draw a loop drawing of vibration beginning to end..

Answer / aftab ahmed mazari

1. Monitor's 3 wires should be connected to Proximitor.
2. Monitor's 3 wire means (a). Power supply for Proximitor wire (b). Common wire (c). Input wire to Monitor.
Now I am connecting from probe (sensor) end.
3. Install probe at fixture.
4. Connect probe connector to extension cable connector
5. Connect Extension cable other end to Proximitor.
Let I explain another way: Probe -> Extension Cable -> Proximitor -> Monitor
aftabmazari@yahoo.com

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

what is load line in control valve?

3 Answers   Boral, Qatar Petroleums,


how many parts of valve positioner?

1 Answers   Kentz,


what is interface level and how it is calibrate?

0 Answers  


How to Calibrate Level Switch in field

0 Answers  


How an rtd work, and what volts/current goes to a rtd to measure the resistance?

0 Answers  


How to convert mmWc(mili meter water colam) to tph(ton per hour)?

0 Answers  


why 1 to 5 vdc is used for output measurment

4 Answers  


If the on Of the DO module is off in the System cabinet, then what is the Procedure to check weather the Module is working or not.

2 Answers   Honeywell,


list of flame proof certification ?

1 Answers   TATA,


A DP transmitter is used to measure the level of an open tank. The drain line of the tank is connected to a control valve, and is configured as, if the level of the tank is 90% the valve should get open 10%. And if the tank level is 10%, the valve should get open 90%. Draw wiring diagram and explain how to configure DP transmitter and control valve using HART communicator. If the span error at output is 1%, what will be the %opening of the control valve at 60% level of the tank?

0 Answers  


send me last 5 years questions asked in rrb chennai, for section engineer

0 Answers   RRB,


The process variables that need to monitored and controlled are ________, ________, _________ and

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)