draw a loop drawing of vibration beginning to end
1. Monitor's 3 wires should be connected to Proximitor.
2. Monitor's 3 wire means (a). Power supply for Proximitor wire (b). Common wire (c). Input wire to Monitor.
Now I am connecting from probe (sensor) end.
3. Install probe at fixture.
4. Connect probe connector to extension cable connector
5. Connect Extension cable other end to Proximitor.
Let I explain another way: Probe -> Extension Cable -> Proximitor -> Monitor
aftabmazari@yahoo.com
| Is This Answer Correct ? | 3 Yes | 0 No |
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
How d.p. Transmitter can be applied to close tank?
there are two candidates p and q in an election.During the campaign,40% of the voters promised to vote for P ,and rest for Q.however, on the day of election 15% of the voter went back on their promise to vote for P and instead voted for Q. 25% of the voters went back on their promise to vote for Q and instead voted for P.suppose,P lost by two votes,then what was the total no. of voters.
why we use the ac supply load cell>?can we use the dc supply load cell?advantages and disadvantage of the ac supply load cell?
Do you have reference list?
why is honed type flow orifice plate? what purpose it used? how to select this?
how pressure transmitter work, what is its principal to measure and how its generate signal. for pressure transmitterinstallation which precautions must be taken ??
Ohm’s law, kirchoff’s law, pascal’s law, Bernoulli’s therem,
the basic of a DP flow transmitter are the following
I am working in a process industry, in that there are several sections devided in the SCADA screens and individual sections may START independently. But sometimes i am facing problem i.e, if section 2 Stopped by the operator immediately Section 1 or Section 3 or Section 4 is getting stopped can you expain the reason behind this?
can we control operation of PLC from operator station?
how many types of viberation transmitter and how to calibrate and where use of vibration transmitter
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)