Answer Posted / aftab ahmed mazari
1. Monitor's 3 wires should be connected to Proximitor.
2. Monitor's 3 wire means (a). Power supply for Proximitor wire (b). Common wire (c). Input wire to Monitor.
Now I am connecting from probe (sensor) end.
3. Install probe at fixture.
4. Connect probe connector to extension cable connector
5. Connect Extension cable other end to Proximitor.
Let I explain another way: Probe -> Extension Cable -> Proximitor -> Monitor
aftabmazari@yahoo.com
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Which topics are covered in Process Control?
how do calibrate the valves.. with clear manual
What are the types of control valves available
what is sliding spool valves?
I have energy meter for educational project having 0.5s class but my friend need 0.2s class meter , which one is good for that purpose and what is the actual difference of that two classes , need very easy example also.??
Which tank weighing system is better to install (Accuracy point of view) 1) Tank weighing system with 3 load cell or 2) Tank weighing system with 4 Load cell
what is the usage of QDV & VOLUME BOOSTER
For what reason would you possibly be compelled to make use of a Smith Predictor. Explain the idea behind the operation of this device.
how to change measuring units from mmwc to cubm/h in rosemount air flow transmitter with hart communicator fluke 744
Explain about safety integrated level protection? . How it was differ from other protections ?
Reason for capillary type dp level transmitter fluctuation
Manipulation of dead wt. tester double piston type.
principle of dead weight tester ?
What is the difference between working pressure and calibration pressure of a control valve
Describe how to use megger to measure the earth resistance and insulation resistance