Answer / balamurugan r
In order to pump a concrete using pump machine to place it
in the final position, it should have the following properties,
1.It should be M20 grade or higher
2.It should have high workability say slump value 90-120mm.
3.It should have well graded aggregates and more cement content.
4.Minimum cement content for this kind of concrete will
around 325kg/cum.
| Is This Answer Correct ? | 7 Yes | 3 No |
Answer / lalit madnawat
Pumpable concrete means
easy to workabale /having
high workability.
&
non pumpable concrete
means hard to workable/low
workability and low w/c
ratio.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / er. amar
Pumpable concrete means the concrete mix having small size
of aggregates and having proportions of water and cement mix
in proper quantity but non pumpable has big size of
aggregates which sometimes during traveling through pipes
gets stuck at some place and due to which it creates problem
for concreting any structure.
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / ganesh
Dear one,
We are using pump in some site where we can not transit the material(concrete)l to work place, concrete used pore in the pump machine and transit rcc via pipe,
slump value should be 120mm minimum for Rcc workability,
| Is This Answer Correct ? | 0 Yes | 0 No |
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
is excessive curing for brick work is good or bad for the walls?
What is difference between combin footing & rapt footing
in 1:2:4 concrete, spcify 1,2 and4 as towhat they indicate?
Prop carrying load capacity
What is the Content in RCC M 35 Grade e.g water content,sand,metal ,cement etc.
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
0 Answers APGenco, Emaar, Madhucon,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)