what is the difference between pumpable concrete and non
pumpable concrete
Answer Posted / balamurugan r
In order to pump a concrete using pump machine to place it
in the final position, it should have the following properties,
1.It should be M20 grade or higher
2.It should have high workability say slump value 90-120mm.
3.It should have well graded aggregates and more cement content.
4.Minimum cement content for this kind of concrete will
around 325kg/cum.
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Explain what is the difference between built area and super built up area?
how to calculate the strength of rebound hammer test reading in building construction ?
What will you do if a portion of load bearing wall collapses under your supervision?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
What is the snap size in civil and how can we create it?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is the difference between undo & redo?
How to increase a bearing capacity of soil?
what is stressing
please briefly explain calculating or estimating steel quantity for a RCC column?
Explain what is change order request?
How to calculate chejja reinforcement
What is meant by cartesian coordinate system?