How many binding wire is use in arrangement of 25mt steel
Answers were Sorted based on User's Feedback
Answer / shweta garg
in steel reinforcement binding wire required is 8kg per MT, so for 25MT the binding wire required is 25*8= 200kg
| Is This Answer Correct ? | 11 Yes | 1 No |
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
this is jagdesh from vizag, IM GOING 2 ATTEND BHEL interview on 14th dec. im a civil engg. graduate. plzz let me know the pattern & few questions of the interview if possible. plz reply at jd_marc@yahoo.com
How calculate the material in concrete mix in ratio 1:2:4 ?
Why did you choose to be an civil engineering
what is unit weight of steel
Plz tell me...column and wall section drawing.
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
why 1.25 factor is to be multiplied to cylindrical strength of concrete while getting the equvalent cubical strength of concrete?
Why we are not provide bar in the centre of the column and bar?
What do you mean by "M-30"?
Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?
28 Answers Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,
how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)