Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between pumpable concrete and non
pumpable concrete

Answer Posted / ganesh

Dear one,
We are using pump in some site where we can not transit the material(concrete)l to work place, concrete used pore in the pump machine and transit rcc via pipe,
slump value should be 120mm minimum for Rcc workability,

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to arrive dry volume of concrete (1.52 to 1.57) ?

2321


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1800


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2111


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

1419


why we are using stub column..? is it possible to construct steel stub column..?

1981


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1650


What is Critical path in Ms-Project ?

1181


HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?

2485


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1531


What is the Hardness of M-40 grade concrete, general and theoratical

2110


What is the quantity of cement in mix m20 concrete?

1144


02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.

2151


What is the zero value in quantity surveying

2523


What are the common ways of demolition?

1251


What are the different softwares used for cad?

1282