what is the difference between pumpable concrete and non
pumpable concrete
Answer Posted / ganesh
Dear one,
We are using pump in some site where we can not transit the material(concrete)l to work place, concrete used pore in the pump machine and transit rcc via pipe,
slump value should be 120mm minimum for Rcc workability,
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how many kg of 20mm, 10mm, dust available in one ton stone boulder
If specific gravity of cement is less than 3.15 what is the cause?
can you give me the details of rate analysis of steel and concrete?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
What tor stands for in tor steel?
what is kribs is supporting?
What is gravity flow?
how to calculate quantity of bricks in circular manhole with examples.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
what are the challenges of being a team leader and a supervisor?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is relation between SPT N value and driving piles after conducting a soil test?