Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between pumpable concrete and non
pumpable concrete

Answer Posted / lalit madnawat

Pumpable concrete means
easy to workabale /having
high workability.
&
non pumpable concrete
means hard to workable/low
workability and low w/c
ratio.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For what purpose bedding is used under storm water drains?

1097


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

6350


what is w/c ratio in dry lean concrete for m10 mix design

8441


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2099


What are the techniques to measure road difference?

1277


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

2334


how to caluclate sienerge qty in construction in ap

2427


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

1419


20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks

2710


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1789


 Describe a time when you anticipated potential problems and developed Preventive measures

3296


What is the compressive strength of fly ash bricks?

1118


What are your goals?

2904


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2612


how i convert mm into standard wire guage (SWG)no.

3045