how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.
Answers were Sorted based on User's Feedback
Answer / piyush singh
DIRECT ESTIMATION METHOD : =
M20 (1:1.5:3) for 10 m^3
1. cement content = 15.2 \ (1+1.5+3)
= 2.763 cum
= 82 bags of 50 kg
2. water = 2.763 cum * 1.5
3. ca + fa = 2.763 * 3 cum
* here 15.2 is a standard value worked out from experiments.
so for 10 m^3 u can divide the sum of ratio by 15.2 to get
amount of cement directly...
* 50 kg of cement (1 bag) = (1/30) m^3 so = 0.034 cum
2.763cum / 0.034 cum = 82 bags
similarly u can work it out for
M25 1:1:2
m15 1:2:4
m10 1:3:6
| Is This Answer Correct ? | 19 Yes | 8 No |
Answer / piyush singh
according to the IS method of design mix
1. select the grade of concrete
2. select the target strength using the equation
f(target) = Fck (selected grade) + 1.65 * sd
3. a) using the table given in IS select the maximum cement
. content
b) selecct the nominal size of the aggregate
c) water cement ration
4. then procced as code says.. and u will get actual amount
of cement , fa ,ca ,water needed for 1 M^3
| Is This Answer Correct ? | 6 Yes | 1 No |
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 8 Yes | 3 No |
Answer / sridhar reddy
what piyash said is write but in place of water take fine aggreate
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / ansari asif ahemad
What Piyush said is right but in place of water take Sand. I think its typing mistake.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / subbarao
by using constants of materials we have to find for 1cu.m and
then for 10cu.m
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / sanket bagade
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between rcc pipe (pressure or non- pressure)and rcc hume pipe?
What is meant by Friction Pile?
Can i have pumpable mix design for M10 concrete without fly ash with OPC 43G cement?
what is the diffrence betwen one way salb & two way salb?
how much need sand and cement for 1 cft roof construction?
1 Answers Indus Valley Construction IVCC,
How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?
0 Answers First MicroFinance Bank FMFB,
how the centre of gravity is used in construction?
What glue is least sticky?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
1 Answers Ajai Builders, Malhotra Associates,
minimum spacing of bars in column????as per code...???
7 Answers PNC, Rajesh Associates,
How to calculate the length of chairs provided to support the top rebar in concrete foundation
what is the cement mortor thickness for 23 cm brick work and 11.5 brickwork?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)