Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.

Answers were Sorted based on User's Feedback



how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / piyush singh

DIRECT ESTIMATION METHOD : =

M20 (1:1.5:3) for 10 m^3

1. cement content = 15.2 \ (1+1.5+3)
= 2.763 cum
= 82 bags of 50 kg

2. water = 2.763 cum * 1.5
3. ca + fa = 2.763 * 3 cum

* here 15.2 is a standard value worked out from experiments.
so for 10 m^3 u can divide the sum of ratio by 15.2 to get
amount of cement directly...

* 50 kg of cement (1 bag) = (1/30) m^3 so = 0.034 cum
2.763cum / 0.034 cum = 82 bags

similarly u can work it out for

M25 1:1:2
m15 1:2:4
m10 1:3:6

Is This Answer Correct ?    19 Yes 8 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / piyush singh

according to the IS method of design mix
1. select the grade of concrete
2. select the target strength using the equation
f(target) = Fck (selected grade) + 1.65 * sd
3. a) using the table given in IS select the maximum cement
. content
b) selecct the nominal size of the aggregate
c) water cement ration
4. then procced as code says.. and u will get actual amount
of cement , fa ,ca ,water needed for 1 M^3

Is This Answer Correct ?    6 Yes 1 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / hitenpatel

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    8 Yes 3 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / sridhar reddy

what piyash said is write but in place of water take fine aggreate

Is This Answer Correct ?    3 Yes 0 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / ansari asif ahemad

What Piyush said is right but in place of water take Sand. I think its typing mistake.

Is This Answer Correct ?    3 Yes 0 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / subbarao

by using constants of materials we have to find for 1cu.m and
then for 10cu.m

Is This Answer Correct ?    3 Yes 2 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / sanket bagade

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

significance of specific surface area of particles?

0 Answers  


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

0 Answers  


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

0 Answers  


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

0 Answers  


What is the difference between stress and pressure

3 Answers  


Reinforcement details at hinged joint

0 Answers  


where lap is provided in colom?

8 Answers  


how much repeitation for conventional and maivan formwork?

0 Answers   Empire,


specific gravity of sand, coarse aggregate, cement.

1 Answers  


What is language of Engineering?

18 Answers   L&T,


CORRECTION Kindly furnish the relation between 7 days strength & 28 days compressive strength of Cement Concrete cubes. Can you clarify whether the relation gets altered due to various WATER-CEMENT ratios and type of cements?

2 Answers  


a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)