how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.

Answer Posted / sanket bagade

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Calculation of curtain wall of box culvert

5309


Explain the importance of moment of inertia?

758


specifications of fe500 steel

3043


what is the percentage of silt in black cotton soil.?

1953


What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

1679






what is the types of surveying?which type of survey carrying for type of work?

1673


IS code for Rolling Margin of steel

1907


Sir how to find cutting length for footing steel bars in the shape of "u"

1319


what is the anchorage length of reinforcement.

1297


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1730


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

1783


Which percentage of carpet area use in plot area of office building.

1390


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

3604


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

1670


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1277