Answer / benarji
fe is called ferros it is steel
415,500 is the yield stength of the bar
so these both defference is only the strength.
| Is This Answer Correct ? | 114 Yes | 8 No |
Answer / kamalraj
max strain in fe415 is 0.0038N/mm2
max strain in fe500 is 0.0042N/mm2
| Is This Answer Correct ? | 28 Yes | 13 No |
Answer / yasmeen
what is m10 , m15 , m20 ? what is "m" and what is different m10 , m15, m20 ?
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / paddy
500 is easily avaiable 415 less easily available.
500 bit more costly than 415
500 slightly mire flexible than 415
however 415 is enough for house construction. Choice is
yours.
| Is This Answer Correct ? | 10 Yes | 6 No |
Answer / sharbutheen
fe is called ferros it is steel
415,500 is the yield stength of the bar
so these both defference is only the strength.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / siddharth
the difference is dat fe500 gives more elongation as
compared to fe415.
| Is This Answer Correct ? | 16 Yes | 13 No |
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
compressive strength of country bricks in india
how to caculate cutting lenght in bar bending schedule for 180 degree bend
How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is Purpose Difference in Stirrups For Beam & Column ?
-what is the meaning of M.S.L for civil field? -what is the grade slab and suspension slab?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
how many hacking to be made in one sqft for concrete surface before plastering as per the IS Code
What is an object snap mode?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)