what is the detention period for oxidation ponds
Answers were Sorted based on User's Feedback
Answer / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
| Is This Answer Correct ? | 6 Yes | 3 No |
why moment is create in fixed beam. And why moment is not create in simply support beam
What is the approx construction cost of 1 lac Sq.ft ..in any place city or town?
What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a stndard size of 440x215x100?
How to calculate the water content cement ratio
3 Answers Godway, Modern Construction Company,
how to absorb to site basic corrections? which are the important correction?
what is the difference between site engineer & site incharge
Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and outurn of mason. Thanks.
if we make b.b.s then bend correction is taken how much..
how much steel is required for 1 sqft of slab
how much unit weight of an RCC Box 3.0mX3.0m will be of design mix concrete M30
Minimum concrete cover in slabs, columns, beams, foundation and other st?
What is the strength of Steel Fe 415 and Fe 500
1 Answers Aditya Constructions,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)