what is the detention period for oxidation ponds
Answers were Sorted based on User's Feedback
Answer / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
Is This Answer Correct ? | 6 Yes | 3 No |
steam curing is not used in which cement
What is difference between load bearing structure and frame bearing structure ?
2 Answers Sathiapal Engineers,
2. What are the grades of steel used in the concrete design?
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
what is Quality Reporting?
In a beam tension is always at the bottom but sometimes when we design using staad we get more number of rebars at the top compression zone Why?
what is the development length?
all engineering filed in which branch mother branch
22 Answers L&T, Manoj Pharma Ltd,
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
What is unit weight of normal concrete?
m25 water cement ratio calculation
how to carry out rate analysis for RCC work in column using M20 ?
1 Answers Mazna Building Contracting,