what is the detention period for oxidation ponds
Answers were Sorted based on User's Feedback
Answer / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
| Is This Answer Correct ? | 6 Yes | 3 No |
why we need pcc?
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
11 Answers L&T, Sobha Developers,
what"s the M book?
Define angular dimension?
How to do rate analysis for concrete work including shuttering work?
0 Answers DBM, Techno Solutions,
How to calculate steel for beam slab and column
How many cover blocks should be provided for 10 sq.m area?
how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work
if the slab is 2 way then,where we will put lapping upper and lower side?means near to beam or center and near to center?
How did the romans get water up hills using aqua ducts?
How to calculate the steel for 392c.meter*450c.meter rcc slab
plz tell me one brick total plaster area?
9 Answers Aparna Constructions, Aparna Enterprises, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)