what is the detention period for oxidation ponds
Answers were Sorted based on User's Feedback
Answer / m. ghailani
The detention time of oxidation pond is equal to influent
discharge divided by the volume of pond.
| Is This Answer Correct ? | 6 Yes | 3 No |
10x10 slab design
what are the types of bricks? & what is strength of this type?
ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars..... IS THIS CORRECT ????
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
what is the difference between factor of safety and partial safety factor.??
i want to know the easy way to find the quantity of steel in a slab , coloumn
how to calculate weight of round steel bar and square steel bar, i section bar and c channel bar, angle bar
How much cement and water required for cement selery????
1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?
rate of 1cum brick masonry please immidate
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
What is lever arm distance
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)