how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.
Answer Posted / subbarao
by using constants of materials we have to find for 1cu.m and
then for 10cu.m
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
what is the weight of 6000 psi concrete in lb/cft?
what is the percentage of silt in black cotton soil.?
What is the exception critarea of cube?
What is 1/8 on the architect ruler denotes?
what is the difference between prime coat and tack coat in road construction
five benefits of using standard terminology in the measurement process
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
why is M30 grade Concrete use for Foothing & Column M50
In the roof of a pumping station explain briefly the components of a waterproofing system?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
what is called Bulk Density of aggregate?
can stub column take the load as main column
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.