Full from of ACC
Answers were Sorted based on User's Feedback
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
DESIGN PROCEDURE OF THE COLUMNS
12mm diameter iron bar having 1m length how much kg weighted ?
11. What was the reason for you to quit your previous job?
Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
What is the slope of vertical wall ? quick ans
WHAT IS THE DIFFERENCE BETWEEN FACTOR OF SAFETY AND PARTIAL SAFETY FACTOR?
what is the meaning fe in steel?
1 Answers Manjeera, Oceanus, PAN, URC Construction,
How do you determine specific gravity of cement?
How to find permissible diagonal tensile stress in reinforced brick work
what is the weight of concrete for 1 cum?
15 Answers Dhenu Infrastructure, L&T,