"how can we find the approximate quantity of materials using
in a building or total Expenditure in percentage for rough
estimate after known the construction area(sqm)".please if you
know something about that please post the answer.
No Answer is Posted For this Question
Be the First to Post Answer
WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?
I need old MMUP exam question and answer for Civil engineering
What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code
what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)
Why we select pile foundations
37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil this result use in construction work
How to calculate the load of partion in flat slab if we use brick?
0 Answers CE, Mahalaxmi Developers,
What is the difference between load bearing and non load bearing walls? How to distinguish both?
Process of pcc in wateredug
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
What is the minimum distance between to stirrup ?
Why the height of the bridges over the river are very low?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)