Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Full from of ACC

Answer Posted / neeraj

Associate Cement Company

Is This Answer Correct ?    28 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what does the track parameter mean in staad.pro?

6065


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1978


How and where are aqueducts built?

1194


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2460


How do you compute the volume of airflow?

1106


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

2099


why top layer of block work shoud be full size if any cut block adjustable than another layer?

2184


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1577


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2849


For Wet Mix Mecadam design what is Optimum moisture content

2037


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2067


How do you compute volume of airflow?

1283


What is meant by solid geometry?

1062


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

2157


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation