Answer / ratheesh
Double binding is always good. if u want to reduce the
construction cost you can use single bind, but above 12 mm
rods should be done with double binding.
| Is This Answer Correct ? | 3 Yes | 0 No |
How many stones require for 1200 Sq ft house
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai.
2 Answers AAI Airports Authority Of India,
8. What do you find more useful in your present work – your education or your practical experience from previous jobs or traineeships?
what is crimping and cripling?
why we are placing the beam under the plinth wall?
How Calculate Lap Length
How to calculate the steel for 392c.meter*450c.meter rcc slab
What is need for setting limits?
how to conversation of all construction material in to brass
in the footings first which reinforcement bar has to be layed as per design criteria.
What is the difference between Wraft and file foundation and where these are used ?
How to calculate the shuttering materials i.e MS sheet,Props,Acrow Spans,2'x3' Runner,4'x3' Runner & beam plywood bottom, sides in thumb rules in slab area
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)