Answer Posted / rahul
Autoclaved Aerated Concrete (A.C.C.)
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is thumb rule for deep trench excavation
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
what is mean by c32/40s concrete class
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
Questions related to civil.engg in company
how to calculate freeboard in under ground water tank and technical details
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
In Rcc ratio calculation I wanted to know quantity of Steel also.
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––