In two way slab where should we stop the work at end of the day?
Answers were Sorted based on User's Feedback
Answer / ajay kulkarni
it should be a little ahead towerds center form point of
contraflexure to allow for bonding roughfly @ L/3 from
either ends for two way slab.
| Is This Answer Correct ? | 11 Yes | 0 No |
What is horizon or horizontal mining?
what is pile foundation?
what do you mean by fe500d what is 500 n what's ,d,
Consumption of Binding wire for fixing of cover block in vertical surface
how to calculate cube strength in percentage
how much binding wire is reqd for 1 MT
what opc & ppc cement $ composition?
What is the meaning of TMT on Steel rebars
what does gabion mattress means in stone pitching works
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
Explain what is alternate bid?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)