while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
No Answer is Posted For this Question
Be the First to Post Answer
why we use aggregate,sand with cement in concrete?
The Instrument used to determine colour of water is called A] Turbidimeter B] osmoscope C] Barometer
Why the statue of liberty is made of copper?
1:4:6 grade 15.84cum and how much cement and sand aggricate are used
1 Answers Minartech Developers,
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
how to calculate quantity of concrete volume of pile with bulb
Difference between lateral ties and stirrups?
how much unit weight of an RCC Box 3.0mX3.0m will be of design mix concrete M30
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
The resultant upthrust on a body partially immersed in a liquid acts through?
5 Answers TNPSC Tamil Nadu Public Service Commission,
what is difference between GTS bench mark and temporary bench mark
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)