while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
No Answer is Posted For this Question
Be the First to Post Answer
is excessive curing for brick work is good or bad for the walls?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
the minimum percentage of steel for 2m rcc slab
How many types of stirrups are there? How to calculate their cut lengths?
what are different grades of concrete and their classifications?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Name four load bearing elements (structural elements) in a framed building
Why are we providing crank in beam? Thanks.
what are the checks to be performed while fixing a door and a window frame..at site??
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
is concealed wiring a problem in fly ash brick wall?