In two way slab where should we stop the work at end of the day?
Answer Posted / ajay kulkarni
it should be a little ahead towerds center form point of
contraflexure to allow for bonding roughfly @ L/3 from
either ends for two way slab.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
door and window wood work calculations and different methods
What is Density of cement, sand & aggregate ?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
what does the grad of cement shows (denotes)?
How much is the cover for slab?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
Reinforcement details at hinged joint
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
What is the force exerted by the tacoma narrows bridge?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How will you reduce the concrete flow after mixing the concrete
What is meant by Crystal Concrete?
List out some of the checking’s, done at the completion of construction?
Can inverted beams used in pipes during construction?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?